您好,歡迎訪問(wèn)禹城泰瑞彩鋼復(fù)合板加工廠!

服務(wù)熱線

18765446878

熱門關(guān)鍵詞:禹城彩鋼廠,禹城彩鋼復(fù)合板,禹城鋼結(jié)構(gòu)板房 彩鋼板房

彩鋼活動(dòng)房對(duì)裝配地點(diǎn)和環(huán)境的要求

來(lái)源:http://m.yunhu3.com 日期:2021-08-25 發(fā)布人:
彩鋼活動(dòng)房現(xiàn)在很常見了,雖然重量輕,但構(gòu)造全體性佳,抗震性佳,房子可多差拆裝,屢差運(yùn)用率高。要注意的是,在彩鋼活動(dòng)房對(duì)裝配地點(diǎn)和環(huán)境是有一定要要求的。
Color steel movable houses are now very common. Although they are light in weight, they have good overall structure and good earthquake resistance. The house can be disassembled and disassembled in many ways, and the utilization rate is high. It should be noted that there are certain requirements for the assembly location and environment in the color steel movable room.
1.地基的硬度:在澆注底子前,要事前測(cè)量佳地基的硬度,如有地形特殊或地基硬度相次太大,務(wù)必作特殊處理,以確保板房能順利裝配和保障裝配后的質(zhì)量,如何特殊處理,與技能部溝通。
1. Foundation hardness: before pouring the foundation, measure the hardness of the good foundation before important matters. If there is special terrain or the foundation hardness is too large, special treatment must be made to ensure the smooth assembly of the plank house and ensure the quality after assembly. How to deal with the special treatment, communicate with the skill department.
2.底子的程度:在底子澆注時(shí),必定要測(cè)量佳程度,底子澆注完后,程度誤次操縱在10MM以內(nèi)。
2. Base degree: during base pouring, the degree must be measured. After base pouring, the degree is manipulated within 10mm by mistake.
3.混泥土標(biāo)號(hào):大局部尺度板房底子為C20。平常情況下內(nèi)無(wú)鋼筋,如有地形、地基特殊情況或板房有特殊要求,應(yīng)以技能部出圖為準(zhǔn)。
3. Concrete grade: C20 at the bottom of large-scale slab house. Under normal circumstances, there is no reinforcement in the. In case of special terrain, foundation or slab house, the drawing of the skill department shall prevail.
4.底子澆注時(shí)間:彩鋼活動(dòng)房的底子澆注應(yīng)與慣例的混泥土澆注工藝一樣,不可減少工藝秩序。在底子澆注完成到板房裝配之間應(yīng)留有充沛時(shí)間,以確保混泥土到達(dá)必定的硬度。
4. Bottom pouring time: the bottom pouring of color steel movable house shall be the same as the conventional concrete pouring process, and the process order cannot be reduced. Sufficient time shall be reserved between the completion of base pouring and the assembly of slab house to ensure that the concrete reaches a certain hardness.
5.要求:為保障裝配工期,裝配質(zhì)量和裝配后整潔美觀,在制造底子的同時(shí),把室內(nèi)地面也一并澆注完成,程度高度與底子一樣,在板房裝配完成后,在室內(nèi)鋪地板既方便,又整潔,也不會(huì)影響板房的質(zhì)量和外觀。室內(nèi)地板的高度應(yīng)比底子程度高度高出50MM,以確保雨水不會(huì)流入室內(nèi)和地圈梁的堅(jiān)實(shí)水平。
5. Requirements: in order to ensure the assembly period, assembly quality and tidiness and beauty after assembly, the indoor floor shall be poured at the same time as the bottom. The degree and height are the same as the bottom. After the assembly of the board room, it is convenient and tidy to lay the floor indoors, and will not affect the quality and appearance of the board room. The height of the indoor floor shall be 50mm higher than the base level to ensure that rainwater will not flow into the room and the solid level of the ground ring beam.
只有把裝配地點(diǎn)和環(huán)境的要求達(dá)到了,裝出來(lái)的彩鋼活動(dòng)房才能堅(jiān)固耐用,更好的保證使用。
Only when the requirements of assembly location and environment are met, the installed color steel movable room can be firm and durable and better ensure the use safety.

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號(hào))

地址:禹城市十里望鎮(zhèn)山東國(guó)際商貿(mào)港往南660米

備案號(hào):魯ICP備2023024436號(hào) 魯公網(wǎng)安備37010202001695號(hào) 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

亚洲黄色高清视频| 亚洲人成无码www久久久| 最新亚洲人成无码网www电影| 亚洲国产日韩在线成人蜜芽| 久久国产亚洲电影天堂| 亚洲AV无码一区东京热久久| 亚洲国产精品高清久久久| 亚洲精品美女久久久久99| 亚洲人成网77777亚洲色| 亚洲午夜国产精品无码老牛影视 | 亚洲成网777777国产精品| 国产亚洲精品2021自在线| 国产亚洲综合精品一区二区三区| 国产精品亚洲专区无码WEB| 亚洲AV无码片一区二区三区| 亚洲AV无码一区二区三区牲色 | 亚洲人精品亚洲人成在线| 亚洲国产系列一区二区三区| 中国亚洲呦女专区| 亚洲av成人一区二区三区观看在线 | 亚洲欧洲国产综合| 亚洲免费观看网站| 亚洲影院天堂中文av色| 亚洲AV无码AV男人的天堂不卡| 青青青亚洲精品国产| 亚洲国产中文字幕在线观看| 精品亚洲一区二区三区在线播放| 亚洲宅男天堂在线观看无病毒| 亚洲国产精品成人精品无码区在线 | 成a人片亚洲日本久久| 亚洲欧洲久久av| 亚洲国产一二三精品无码| 久久久久亚洲精品影视| 中文字幕亚洲精品资源网| 亚洲av永久无码嘿嘿嘿| 亚洲精品无码少妇30P| 亚洲国产精品丝袜在线观看| 亚洲精品成人片在线观看精品字幕 | 亚洲AV无码不卡在线观看下载 | 亚洲一区二区三区偷拍女厕 | 亚洲国产区男人本色|