鋼結構活動板房地基的處理要注意什么?

來源:http://m.yunhu3.com 日期:2023-10-06 發布人:
鋼結構活動板房是目前使用為廣泛的臨時住房建筑,雖然活動房的主要骨架是鋼結構的,但它的地基可不是,大多數地基是混凝土結構的,鋼結構活動板房對地基的硬度有一定要求,地基的硬度決定了要不要做特殊處理,打好地基對于工程來說關重要。
Steel structure prefabricated houses are currently widely used temporary housing buildings. Although the main skeleton of the prefabricated house is steel structure, its foundation is not. Most foundations are concrete structures, and steel structure prefabricated houses have certain requirements for the hardness of the foundation. The hardness of the foundation determines whether special treatment is necessary, and laying a good foundation is crucial for the project.
1.要進行硬度測試,特殊的地形和地基的硬度對建造活動房來說有較大的差別,應當作特殊的處理,保證鋼結構活動板房可以順利安裝,確保其質量,技術人員應該提前進行測量。
Firstly, hardness testing should be conducted. Special terrain and foundation hardness have significant differences for the construction of prefabricated houses, and special measures should be taken to ensure the smooth installation of steel structure prefabricated houses and their quality. Technical personnel should conduct measurements in advance.
 禹城鋼結構板房
2.完成了地基的測量后,接下來就是基礎澆筑,這時的在于必須先測量好水平,在完成了澆筑后,應該控制水平的誤差在10mm內。必須要保證基礎面水平在誤差以內,這樣才不會影響后續的工作進程。
After completing the measurement of the foundation, the next step is foundation pouring. At this point, the key is to measure the level first. After completing the pouring, the horizontal error should be controlled within 10mm. It is necessary to ensure that the level of the foundation surface is within the error range, so as not to affect the subsequent work process.
3.混凝土標號,一般情況下基礎為c20且內無鋼筋,當然,在特殊的地形或者其他不可抗拒的條件下,應當根據技術人員的測定來頂下終方案。
3. Concrete grade, usually based on c20 and without steel bars inside. However, in special terrain or other irresistible conditions, the final plan should be determined based on the determination of technical personnel.
4.澆注時間,跟常規的混凝土澆筑工藝一樣,鋼結構活動板房同樣不可以減少工藝程序,基礎澆筑完成后或者活動板房安裝之前應該留充分的時間讓混凝土達到硬度要求。
4. Pouring time: Like conventional concrete pouring processes, steel structure prefabricated houses cannot reduce the process procedures. After the foundation pouring is completed or before the installation of the prefabricated house, sufficient time should be left to ensure that the concrete meets the hardness requirements.
5.后的澆筑,制作基礎的同時,必須跟室內地面一起澆筑完成,水平高度跟基礎一樣,這樣可以確保安裝工期、質量以及安裝后的美觀。活動板房安裝好了以后,在室內鋪地板,這樣既方便又整潔。
5. The subsequent pouring, while making the foundation, must be completed together with the indoor ground, with the same horizontal height as the foundation, to ensure the installation period, quality, and aesthetics after installation. After the installation of the prefabricated house, the floor should be laid indoors, which is both convenient and tidy.
另外,室內地板的水平高度應該比基礎水平高出50mm,保證雨水不會流入室內以及保證地圈梁的牢固程度。
In addition, the horizontal height of the indoor floor should be 50mm higher than the basic level to ensure that rainwater does not flow into the room and to ensure the firmness of the ground ring beam.
本文的精彩內容由禹城鋼結構板房提供知識提供,本網站還有很多的精彩內容,更多的內容您可以點擊進入:http://m.yunhu3.com我們有專門的客服為您解答問題
The exciting content of this article is provided by Yucheng Steel Structure Board House, and there are many exciting content on this website. You can click to enter more content: http://m.yunhu3.com We have dedicated customer service to answer your questions

聯系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮山東國際商貿港往南660米

備案號:魯ICP備2023024436號 魯公網安備37010202001695號 網站地圖|XML|TXT

微信二維碼

微信二維碼

亚洲爆乳无码专区| 亚洲成A人片在线观看中文| 伊人久久亚洲综合| 亚洲精品国产日韩无码AV永久免费网 | 亚洲黄色免费电影| 亚洲av鲁丝一区二区三区| 亚洲国产精品嫩草影院在线观看| 亚洲色偷偷偷鲁综合| 亚洲无线观看国产精品| 亚洲乱色熟女一区二区三区丝袜| 久久亚洲中文字幕精品一区四| 国产aⅴ无码专区亚洲av麻豆| 久久精品夜色噜噜亚洲A∨| 久久影视综合亚洲| 亚洲精品午夜国产VA久久成人| 久久精品国产亚洲沈樵| 亚洲AV无一区二区三区久久| 亚洲AV乱码久久精品蜜桃| 亚洲高清美女一区二区三区| 亚洲乱码一二三四区麻豆| 丁香婷婷亚洲六月综合色| 亚洲影院天堂中文av色| 久久亚洲精品成人无码| 亚洲AV之男人的天堂| 日韩精品亚洲aⅴ在线影院| 国产精品亚洲а∨无码播放 | 亚洲区日韩精品中文字幕| 久久水蜜桃亚洲AV无码精品| 亚洲M码 欧洲S码SSS222| 亚洲最大av无码网址| 亚洲精品无码成人AAA片| 亚洲成年人在线观看| 亚洲无人区视频大全| 亚洲一区二区无码偷拍| 四虎精品亚洲一区二区三区 | 亚洲免费观看在线视频| 亚洲欧美第一成人网站7777| 免费亚洲视频在线观看| 亚洲中文字幕日产乱码高清app| 久久亚洲国产成人亚| 亚洲国产av一区二区三区丶|