濟南工程板房地基施工的要求有哪些?

來源:http://m.yunhu3.com 日期:2020-09-14 發布人:
濟南工程板房地基的硬度要求:甲方在澆注基礎前,要事先測量好地基的硬度,如有地形特殊或地基硬度相差太大,必須作特殊處理,以確保板房能順利安裝和保證安裝后的質量,如何特殊處理,與技術部溝通。
The hardness requirements of the slab house foundation of Jinan project: before pouring the foundation, Party A should measure the hardness of the foundation in advance. If there is special terrain or the foundation hardness difference is too large, special treatment must be made to ensure the smooth installation of the board house and ensure the quality after installation. How to deal with the special treatment should be communicated with the technical department.
濟南工程板房
Jinan Engineering Plank house
1、工程板房基礎的水平:在基礎澆注時一定要先測量好水平,基礎澆注完成后,水平誤差控制在10mm以內。在與甲方交待時或基礎完工后,要求甲方保證基礎水平面在誤差范圍內,否則,影響板房的安裝或安裝后的質量,甲方自負。
1. The level of Engineering Plank house foundation: the level must be measured before the foundation pouring. After the foundation pouring is completed, the horizontal error shall be controlled within 10 mm. Party A is required to ensure that the horizontal plane of the foundation is within the error range when it is explained to Party A or after the foundation is completed, otherwise, the installation of the board house or the quality after installation will be affected, and Party A shall be responsible for it.
2、混凝土標號:本公司標準板房基礎為C20。一般情況下內無鋼筋,如有地形、地基特殊或板房特殊,以技術部出圖為準。
 
2. Concrete mark: the company's standard slab house foundation is C20. Generally, there is no reinforcement inside. If there is special terrain, foundation or slab house, the drawing of technology department shall prevail.
3、工程板房基礎澆注時間:板房的基礎澆注應與常規的混凝土澆注工藝一樣,不可減少工藝程序。在基礎澆注完成到板房安裝之間應留有充分的時間,以確保混凝土達到規定的硬度。
3. Pouring time of the foundation of the Engineering Plank house: the foundation pouring of the board house should be the same as the conventional concrete pouring process, and the process procedure cannot be reduced. Sufficient time should be left between the completion of foundation pouring and the installation of slab house to ensure that the concrete reaches the specified hardness.
4、工程板房地基要求:為保證安裝工期、安裝質量和安裝后整潔美觀,我公司要求甲方在制作基礎的同時,把室內地面也一并澆注完成,水平高度與基礎一樣,甲方在板房安裝完成后,再在室內鋪地板既方便,又整潔,也不會影響板房的質量和外觀。
4. Requirements for the foundation of Engineering Plank house: in order to ensure the installation period, installation quality and neatness and beauty after installation, our company requires Party A to complete the indoor floor at the same time of making the foundation, and the horizontal height is the same as that of the foundation. After the installation of the board house, Party A will lay the floor indoors, which is convenient and tidy, and will not affect the quality and appearance of the board house.
室內地板的水平高度應比基礎水平高度高出50㎜。以確保雨水不會流入室內和地圈梁的牢固程度!
The horizontal height of the indoor floor shall be 50 mm higher than that of the foundation. To ensure that rainwater will not flow into the room and the firmness of the ground ring beam!

聯系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮山東國際商貿港往南660米

備案號:魯ICP備2023024436號 魯公網安備37010202001695號 網站地圖|XML|TXT

微信二維碼

微信二維碼

亚洲第一成年男人的天堂| 亚洲最大在线观看| 亚洲日韩中文字幕在线播放| 亚洲剧场午夜在线观看| 亚洲视频在线一区二区| 亚洲一区二区三区久久| 久久久青草青青亚洲国产免观| 亚洲hairy多毛pics大全| 精品亚洲成a人片在线观看少妇| 亚洲爽爽一区二区三区| 亚洲午夜激情视频| 亚洲尤码不卡AV麻豆| 亚洲综合无码精品一区二区三区| 亚洲色成人网站WWW永久四虎| 亚洲AV无码专区电影在线观看| 一本久到久久亚洲综合| 亚洲日本香蕉视频| 亚洲AV综合色区无码二区爱AV| 亚洲av无码一区二区三区天堂古代 | 亚洲成A人片在线观看WWW| 亚洲av无码成人黄网站在线观看| 亚洲人成电影亚洲人成9999网| 久久久久亚洲精品天堂| 亚洲精品无码激情AV| 亚洲精华液一二三产区| 亚洲一区二区三区精品视频| 日韩亚洲国产综合高清| 亚洲精品在线免费看| 亚洲精品免费视频| 亚洲视频免费在线播放| 亚洲免费福利在线视频| 日韩国产欧美亚洲v片| 国产偷窥女洗浴在线观看亚洲| 老牛精品亚洲成av人片| 亚洲中文字幕无码中文| 亚洲人成高清在线播放| 亚洲精品无码久久久久APP| 亚洲高清偷拍一区二区三区| 黑人粗长大战亚洲女2021国产精品成人免费视频 | 国产精品国产亚洲区艳妇糸列短篇 | 亚洲国产乱码最新视频|